Interview Questions & answers about Rigging Safety




1.Question.what is width of crane tyre?
Answer.Average 25mm
2. what is the wind speed limit during Rigging ?
Ans -Lifting will be stopped , if the wind speed is --
* 32 km h = 20 mile ph = 8.998 M/s
3. what is tandem lifting ?
Ans - A lift in with two crane are used for lifting is called tend um lifting.
4.Question.what is the name of device which indicate the crane boom angle ?
Answer. BAI_Boom angle indicator
5. How many types of crane ?
Ans -
* Mobile crane * crawler crane
* Tower crane * overhead crane
* Gantry crane * Monorail crane
6. what is SWL ?
Ans - safe working load is the maximum load that can apply to the lifting tools , safely.
7.what is work radius ?
Ans - Is the maximum distance where a certain activities for lifting or rigging jobs in progress.
8.Question. What is lifting gear equipment?
Answer
Lifting equipment, also known as lifting gear, is a general term for any equipment that can be
used to lift loads.
9.Question.what is PWASS?
ANSWER.PWASS means proximately warning Alarm system .It is installed in heavy
equipment like excavator, bulldozer. This system automatically give alarm when anybody
come in touch within 5 metre
10.Question. What is lifting gear equipment?
Answer
Lifting equipment, also known as lifting gear, is a general term for any equipment that can be
used to lift loads.
11.Question.what is PWASS?
ANSWER.PWASS means proximately warning Alarm system .It is installed in heavy
equipment like excavator, bulldozer. This system automatically give alarm when anybody
come in touch within 5 metre.
12. Question : What is the load chart?
Answer.
Definition of load chart. : a schematic and graphic device to indicate the amount of
authorized work yet to be performed by a machine, a group, or any other producing unit in a factory.
13.Question.what is SWL?
ANSWER The SWL the another name is (NWL)NORMAL WORKING LOAD,is determined
by dividing the minimum breaking strength (MBS) of a component by a safety factor
assigned to that type and use of equipment.
14.what is parts of crane ?
Ans-
* Boom. * sling * shackle
* Tying jib * Antiblock
* outer rigger * Auxiliary hoist
* pulley. * web sling
* LMI (load movement indicator ).
15.what is different types of slings used for lifting ?
Ans --
* synthetic / Nylon webbing
* wire rope slings
* chain slings
16.Question : What is a plug brake?
Answer
Plug braking, also referred to as dynamic braking, is a safe way to slow down a vehicle with
a series motor when the motor direction is reversed. Without plug braking, if the operator
reverses direction while the vehicle is in motion the armature will lock up.
17. Question.what is the maximum wind speed for working at height?
Answer There is a 'rule of thumb' that in the tower climbing industry it is recommended that
climbers do not work at wind speeds greater than 20 knots (23 mph) at the working height.
18. Question.what is the maximum wind speed for working on roof for skating or tilings?
Answer. 23 mph but if you are fixing or handling sheet longer than 5 metres more than 2
metre above the floor then 17 mph is allowed
19. Question What is the safe aisle width for forklift or heavy equipment required?
Answer The recommended width of aisles is at least 3 feet wider than the largest equipment
to be utilized, or a minimum of 4 feet.
20.Question. What is lifting gear equipment?
Answer
Lifting equipment, also known as lifting gear, is a general term for any equipment that can be
used to lift loads.
21. Question: What are the hazards in crane lifting ?
Answer.Hazard;
Crane topple, suspended load and drop, hit on to personnel and structure.
Equipment failure
Falling of load
Load hitting any plant facility
Crane hitting plant facilities
Question : What is the load chart?
Answer.
Definition of load chart. : a schematic and graphic device to indicate the amount of
authorized work yet to be performed by a machine, a group, or any other producing unit in a
factory.
23. Questions. what is Rigging & slinging ?
Ans - It is a part of mechanical handling activity which involves lifting and shifting of heavy
material through the safe use of equipment, machinery of devices. Such as crane , wire
rope , hooks , shackles and chain pulleys etc.
24. What are the requirements of a man basket ?
Ans - It should be designed and fabricated according to standards have a party certificate
two guide rope damage free lifting gears the load bearing capacity should be written on man
basket shackles with cotter pin only to be used.
25. Question. What machines are used to lift heavy objects?
Answer.
A machine for lifting heavy objects on an assembly line is shown. It consists of a straight
member ABC, a quarter-circular member CDE, and a hydraulic cylinder BD In the position
shown, the hydraulic cylinder is vertical.
26.Question: What is LMI OR RCL in crane?
ANSWER The LMI(load movement indicator) another name is RATED CAPACITY
LIMITER(RCL) is an operational aid that warns a crane operator of approaching overload
conditions and over hoist conditions that could cause damage to equipment and personnel.
27.Question.What is a working load limit?
Answer.
The working load limit, also marked at WLL, is the maximum allowable load assigned to
each synthetic web tie down by the manufacturer which is not to exceed one-third of the
complete assembly breaking strength. This means a strap with a break strength of 16,200
lbs. would have a WILL of 5,400 lbs.
28. Question. What is difference between WLL and SWL?
ANSWER.WILL work load limit is determined by the manufacturers but SWL is determined
by a third party inspection authority.SWL is always lower than the WALL,also known as the
Minimum Breaking Load (MBL).SWL or WLL are calculated by dividing the MLB by a safety
factor.
29.Question: What are the two types of plans we use for our lifts and what criteria goes with
each (pick all that apply)?
1. General Lift Plan, 0 to 75%
2. General Lift Plan, 75 to 85%, Section 1 and 2 Completed
3. Critical Lift Plan, 85% or Greater
4. Critical Lift Plan, Multiple Crane Pick
5. Critical Lift Plan, Picking Within the Radius of Power lines.
30. Question What are the main causes of crane accidents?
Answer.
The major causes for crane accidents include: outrigger use, dropped loads, rigging failure,
overturned cranes, boom collapsing or buckling, falls and the improper dismantling or
assembly of the crane. Sadly, just about 11 percent of all the accidents relating to cranes are
caused by some kind of mechanical failure.
31. Question. when boom truck lifting is considered critical lifting?
Answer Question.when boom truck lifting will be considered as a critical lifting?
Answer. A lift by boom truck that exceeds 90% of its rated capacity while it is lifting the load
at a load radius of more than 50% of its maximum permitted radius.
32.Question : what are lifting accessories?
Answer Lifting accessories are pieces of equipment that are used to attach the load to lifting
equipment, providing a link between the two. Any lifting accessories used between lifting
equipment and the load may need to be taken into account in determining the overall weight
of the load.
33. Question. How will you calculate load on crane?
Answer EXAMPLE: You need to lift a load of 15 tons (30,000 pounds) a distance of 25 feet.
The distance is measured from the center pin of the crane to the center of the load. Once
you determine the distance, look on that line for the largest capacity; that will indicate how
many feet of boom must be extended.
34.Question At what Height medical certificate is required.?
Answer 2.3 metre
If any electrician or worker working on electrical panel at height and therefore must have a
medical certificate of fitness and wear a safety harness(of which the lanyard is 2.5m length
and cannot be attached at any point higher than 2.5m above ground level.
35.Question : What are different types of cranes?
Answer. - So what are the different types of cranes used in construction?
Mobile Cranes. ...Telescopic Crane. ...Tower Crane. ...Truck Mounted Crane (also known as
boom truck or picker truck) ...Rough Terrain Crane. ...Loader Crane (also know as a folding
boom crane) ...Overhead Crane.
36.Question: What are the cranes made out of?
Answer
Hollow tubes, such as those used to form the latticed booms of large cranes, may be made
by bending sheets of steel and welding the long sides together. They may also be made by
piercing steel rods with a rotating steel cone. 3 The cables used to lift weights are made
from steel wires.
37.Question.What is TAC3000 in Tower crane?
AnswerC-3000 is a safety and efficient monitoring system which helps to prevent serious
and even fatal accidents which can be caused by human error. With this efficient helping
tool, it increases site productivity and a safer operating environment. However, TAC-3000 is
not a fail safe safety system as the tower crane operation is still in the operator's control.
38. Question.What is a critical lift plan?
Answer.
Critical lifts include: lifts made where the load weight is greater than 75% of the rated
capacity of the crane; lifts which require load to be lifted, lifting which is swung or placed out
of the operator's view , it's also considered critical lifting. lifts made with more than one
crane is also said critical lifting.
39.Question: What is LMI OR RCL in crane?
ANSWER The LMI(load movement indicator) another name is RATED CAPACITY
LIMITER(RCL) is an operational aid that warns a crane operator of approaching overload
conditions and over hoist conditions that could cause damage to equipment and personnel.
40.How sling are inspected ?
And - All sling must be inspected before every use and periodically it should be inspected
thoroughly and shall be,rejected. If found were one third of the original outside the diameter
of outside individual wires serve corrosion distortion linking crushing bird logins broken wire.
41.what are the requirements of a crane lifting / operation ?
Ans -
* crane position on firm & level ground with wood pads and steel plates
* outriggers are fully extended , tires are off the ground
* certified operator and rigger are available safe load indicator is working the checklist filled
by competent persons.
42.what is the potential hazards while performing lifting operation ?
Ans - Hazards:
* Accident hit or crush by hanging load
* Falling object
* collapse of lifting equipment due to overhead
* overturning of the crane
* Failure of lifting gears such as Wire ropes , hooks , shackles, eyebolts, chain etc.
43. what is lifting plan ?
Ans - It is document prepare for planning a critical lift by calculating and considering all
factors which is going
44.Question : what are lifting accessories?
Answer - Lifting accessories are pieces of equipment that are used to attach the load to
lifting equipment, providing a link between the two. Any lifting accessories used between
lifting equipment and the load may need to be taken into account in determining the overall
weight of the load.
Examples of lifting accessories include:
fibre or rope slings. chains (single or multiple leg). Hooks, Eyebolts Spreader beams.
Magnetic and vacuum devices
45.Question. How will you calculate load on crane?
Answer EXAMPLE: You need to lift a load of 15 tons (30,000 pounds) a distance of 25 feet.
The distance is measured from the center pin of the crane to the center of the load. Once
you determine the distance, look on that line for the largest capacity; that will indicate how
many feet of boom must be extended.
Question. At what Height medical certificate is required.?
Answer 2.3 metre
If any electrician or worker working on electrical panel at height and therefore must have a
medical certificate of fitness and wear a safety harness(of which the lanyard is 2.5m length
and cannot be attached at any point higher than 2.5m above ground level
Note.some clients need medical certificate for working at height then after fitness required
2.3 metre for working at height otherwise 1.8 metre.
49. Question: What are the cranes made out of?
Answer
Hollow tubes, such as those used to form the latticed booms of large cranes, may be made
by bending sheets of steel and welding the long sides together. They may also be made by
piercing steel rods with a rotating steel cone. 3 The cables used to lift weights are made from
steel wires.
50. Question.what are the categories for mobile crane?
Answer The categories of licence for mobile cranes
are as follows:
CN – Non-slewing mobile crane (greater
than 3 tonne capacity)
C2 – Slewing mobile crane (up to 20
tonnes)
C6 – Slewing mobile crane (up to 60
tonnes)
C1 – Slewing mobile crane (up to 100
tonnes)
C0 – Slewing mobile crane (open/over 100 TON
51. Question what is lifting plan comprises about?
Answer Lift Plan.
A Lift Plan is prepared or identified for every lift. The Lift Plan comprises as given below.
1.The competent person planning the lift.
2.Calculations.
3.Equipment required.
4.Personnel required and their particular roles.
5.Step-by-step instructions.
6. Communication methods to be used.
7. Contingency and rescue plans
52. Question.What is TAC3000 in Tower crane?
AnswerC-3000 is a safety and efficient monitoring system which helps to prevent serious
and even fatal accidents which can be caused by human error. With this efficient helping
tool, it increases site productivity and a safer operating environment. However, TAC-3000 is
not a fail safe safety system as the tower crane operation is still in the operator's control.
53. Question. Write hazards and control measures for crane lifting?
Answer - Some more Hazards below
Crane topple, suspended load and drop, hit on to personnel and structure.
Control measure -
Lifting plan, permit to work, equipment maintenance and checklist, competent crane
operator, cordon off the lifting zone and correct rigging method, competent rigger and
signalman, tagline to control the load.
54.Question.Describe about Anti two block work in crane?
Answer.Anti two-blocking is a Safety device in crane which automatically prevents damage
from contact between the load block, overhaul ball, or similar component, and the boom tip
or fixed upper block or similar component.
It was manufactured in 1992.
55.Question.What is the lifting plan / rigging plan?
Answer.
A rigging plan is developed every time a heavy load is being lifted. The basic idea behind a
rigging plan is to have control and establish safety precautions. It is an important planning
process that will identify all hazardous situations that might be encountered during lifting.
56.Question : What is the load chart?
Answer.
Definition of load chart. : a schematic and graphic device to indicate the amount of
authorized work yet to be performed by a machine, a group, or any other producing unit in a
factory.
57.Question.What is a critical lift plan?
Answer.
Critical lifts include: lifts made where the load weight is greater than 75% of the rated
capacity of the crane; lifts which require load to be lifted, lifting which is swung or placed out
of the operator's view , it's also considered critical lifting. lifts made with more than one
crane is also said critical lifting.
59.Question.what is SWL?
ANSWER The SWL the another name is (NWL)NORMAL WORKING LOAD,is determined
by dividing the minimum breaking strength (MBS) of a component by a safety factor
assigned to that type and use of equipment.
60. Question.what is the name of device which which indicate the crane boom angle.
ANSWER.BAI.
BOOM ANGLE INDICATOR
61. Question. What are the most common crane incidents?
Answer.
• Cranes contacting high voltage power lines
• Cranes tipping over
• Booms bending because of overloading
• Materials falling because of improperly secured loads or rigging
• Structural failure of the crane itself
• Incidents as a result of poor communication between the operator and site
person
62.Question. What is difference between WLL and SWL?
ANSWER.WILL work load limit is determined by the manufacturers but SWL is determined
by a third party inspection authority.SWL is always lower than the WALL,also known as the
Minimum Breaking Load (MBL).SWL or WLL are calculated by dividing the MLB by a safety
factor
63.Question What is the safe aisle width for forklift or heavy equipment required?
Answer The recommended width of aisles is at least 3 feet wider than the largest equipment
to be utilized, or a minimum of 4 feet.
64.Question.what is the maximum wind speed for working at height?
Answer There is a 'rule of thumb' that in the tower climbing industry it is recommended that
climbers do not work at wind speeds greater than 20 knots (23 mph) at the working height.
65. Question.what are the mobile crane?
Answer The categories of licence for mobile cranes
are as follows:
CN – Non-slewing mobile crane (greater
than 3 tonne capacity)
C2 – Slewing mobile crane (up to 20
tonnes)
C6 – Slewing mobile crane (up to 60
tonnes)
C1 – Slewing mobile crane (up to 100
tonnes)
C0 – Slewing mobile crane (open/over 100 TON
Question.what is the name of device which indicate the crane boom angle ?
Answer.
BAI_Boom angle indicator
66.Question what is lifting plan comprises about?
Answer - Lift Plan.
A Lift Plan is prepared or identified for every lift.
The Lift Plan comprises as given below.
1.The competent person planning the lift.
2.Calculations.
3.Equipment required.
4.Personnel required and their particular roles.
5.Step-by-step instructions.
6 Communication methods to be used.
7. Contingency and rescue plans.
65.Question.What is lifting plan?
Ans: It is the document prepared for planning a critical lift by calculating and considering all
factors which is going to affect the lift and there by selecting the correct tools and cranes and
ensure the safe lifting procedure to be followed for the particular lift, giving details such as
the size and weight of the object to be lifted, which crane is used for lifting and what the
safety factor is, where the crane is positioned, from where the load is lifted, where it is fitted,
size and SWL of each lifting tool used. And load chart is attached with it.
66 .Describe the Rigging load capacity of riggers of all levels ?
Ans -
* Rigger I is required for lifts over 40 tons, and must approve all lift plans
* Rigger II can not rig a loaf over 40 tons
* Rigger III can not rig a load over 10 tons.

Comments

  1. Very informative but if possible to add the calculate method formula that will be much better

    ReplyDelete
  2. Well, it’s a nice one, I have been looking for crane service. we provide crane truck hire Brisbane at affordable cost. to know more visit our website.

    ReplyDelete
  3. This comment has been removed by the author.

    ReplyDelete
  4. I recently came upon your blog and wanted to express how much I liked reading your postings. I'm hoping you'll write again soon. Thank you very much for the excellent information. pipe handler equipment online USA

    ReplyDelete
  5. It's good ...I like all the questions and answers..

    ReplyDelete
  6. if possible add the calculare method formula that will be much better. thank you sir

    ReplyDelete

Post a Comment

Thanks for Your great replay .....

Followers

Popular posts from this blog

Safety Officer's WhatsApp Group Link .

Click given below image and Join This Safety Officer's WhatsApp Group. Join and Share safety content. Why Join the Safety Officer WhatsApp Group? Knowledge Sharing: The Safety Officer WhatsApp Group is a platform for safety officers, HSE professionals, and anyone interested in safety to share their knowledge, experiences, and expertise. Whether you have a safety concern or are looking for advice on implementing safety protocols, our group members are ready to offer their insights. Stay Updated: The world of safety is ever-evolving, with new technologies and regulations being introduced regularly. By joining our group, you'll receive real-time updates on industry news, safety standards, and innovative safety solutions. Networking Opportunities: Connect with safety officers and professionals from different industries and regions. Exchange ideas, learn from others' experiences, and build a strong professional network. Safety Tips and Best Practices: Our group members

100 Safety Topics for Daily Toolbox Talk !!!!!!!!! [DOC]

 Hey there! Today, I want to talk to you about something super relevant – workplace safety (1 00 Safety Topics for Daily Toolbox Talk ). It's crucial to be aware of potential hazards in our work environment because knowing about them can save lives, and that's a big deal!   So let's dive in! We'll start with the basics, like what fire is and the different types of fire out there. Understanding these classes will help you know which fire extinguisher to use in different situations. Safety isn't about being a hero; it's about being prepared!   Oh, and speaking of being prepared, we'll also cover electrical safety. You'll learn about electrical area classification, electric shock risks, and how sealing conduits play a vital role in keeping everyone safe.   Now, let's talk about personal protective equipment ( PPE ). It might not be the most fashionable stuff, but trust me, it can be a lifesaver! Wearing the right gear can protect you

Important 54 Safety Toolbox Talk Topics Free download in PDF

Most Important 54 Safety Toolbox Talk Topics  Free download in PDF ...... Toolbox talks are short safety briefings / discussions on a particular safety topic relevant to a group of people. They might cover a particular hazard the group faces and the required control measures, learning from recent incidents etc. Toolbox talks are typically given to a group of people working in a specific area and could involve from a few workers up to more than 100 It should be used by toolbox talk leaders and supervisors to help them to prepare for their talks but it also should be used by management who attend talks to help them assess the quality and give feedback to the briefers.  Tool Box Talks Preparation:  Choose a suitable topic for the tool box talk. o This should be relevant for the audience o It should cover relevant hazards and their control measures o Try to include learning from incidents where possible to show the possible consequences o Toolbox talk should also include an update on any

Official Facebook page