Time limit of preliminary report?
|
24 Hours.
|
2
|
How many type of work permits
|
4 Types
|
3
|
What shell be distance between flammable
storage and bulk combustible
|
15 Meters ( 50 feet ).
|
4
|
What is safe procedure to lighting the torch
cutting operation?
|
Spark Lighter.
|
5
|
What is the safety method to prevent cave ins
in excavation?
|
Shoring, Sloping and Benching.
|
6
|
What is the frequency of 10 minute safety talk?
|
Weekly.
|
7
|
Explain the safe way to carry if load at fork
lift obstruct the front view?
|
Reverse.
|
8
|
What safety device shell be used to prevent
direct contact with object and circular saw?
|
Push Stick.
|
9
|
What is the meaning of FM & UL?
|
Factory Mutual And Underwriters Laboratory.
|
10
|
What is the voltage rating
preferred / allowed to use
|
110 Volts.
|
11
|
What is the main component of standard
guardrail system?
|
Post ( Standard ).
|
12
|
What you will explain during orientation of
newly mobilized workers,
|
Sanitary, Evacuation Plan and CSM
rules & regulations.
|
13
|
What are the basic PPE in construction site,
give at least five?
|
Hard Hat, Safety Goggles, Safety Shoes, Hand
Gloves,
|
14
|
What is the safety method being used to prevent
static electricity built up?
|
Grounding.
|
15
|
What is the safety device that can be used in
circuit to prevent short
|
Ground Fault Circuit Interrupter ( GFCI )
|
16
|
Who will certify the operator of cartridge
tools?
|
Vendor.
|
17
|
What is the standard stated that how
water dispenses of site
|
Every job site.
|
18
|
What is the basic requirement for a crane to
use site?
|
Having a valid Inspected Sticker.
|
19
|
What safety device shell be use if someone
assigned as a flagman?
|
Reflected orange color vest and flag.
|
20
|
How to protect the cylinder if it is not in
use?
|
With valve cap.
|
21
|
What is the color of oxygen cylinder?
|
Green.
|
22
|
Gas test is required below the depth is?
|
4 feet or deeper.
|
23
|
Angle , Slope & Rating of ladder placement?
|
3 feet above the landing, 75º slope and spacing
every 25 feet.
|
24
|
What type of fire extinguisher shell be used
for type “C” fire?
|
CO² Type.
|
25
|
What
type of fire extinguisher shell be used for type “A” fire?
|
Water
type.
|
26
|
No
vehicle or plant shell be operated unless the operator holds?
|
Hot
work permit.
|
27
|
What
shell be used to prevent flashback fire in gas cutting torch?
|
Flashback
Flame Arrestor.
|
28
|
Who
authorized to receive , request & obtain work permit?
|
Permit
Receiver.
|
29
|
What
is type “A” soil?
|
Clay,
Rock.
|
30
|
Give
reason why accident need to be reported?
|
To
prevent further accident.
|
31
|
What
is the normal contact of oxygen inside the confined space?
|
19-23%
|
32
|
What
is the duty of stand by man?
|
To
watch the workers and possible hazards.
|
33
|
Give
at least three duties of a Safety Officer?
|
Educate
the employees, Reporting and Monitor the workers,
|
34
|
What
is the meanings of LEL?
|
Low
Explosive Level.
|
35
|
What
is the meanings of PPM?
|
Part
Per Million.
|
36
|
H2S
concentration level requiring breathing apparatus?
|
Self
Confined Breathing Apparatus ( SCBA ).
|
37
|
What
main purpose is locked and tag out system?
|
To
avoid injury.
|
38
|
How
many hours exposure allowed when working 90 dbA level?
|
8
hours.
|
39
|
What
MSDS?
|
Material
Safety Data Sheet.
|
40
|
What
you can find in MSDS?
|
Hazards
Material & Classification.
|
41
|
What
should be discussed in safety toolbox meeting?
|
How
to work safely and previous unsafe conditions or
|
42
|
What
you will do when H2S leak encountered?
|
Stop
the work, shut off the tools & equipments and go to the
|
43
|
What
is the ratio of number of toilets required on work site?
|
1
toilet for 15 persons.
|
44
|
Who
is responsible for the work permit?
|
Receiver.
|
45
|
Cylinders
are not designed for temperatures in excess of?
|
|
46
|
All
lamps shell be enclosed by?
|
|
47
|
Are
eye or flash is a well-known condition in welding operations and is
|
|
48
|
Full
body harness shell be worn at all work areas where a man could fall?
|
1.8
meter ( 6 feet )
|
49
|
Lanyard
length shell be?
|
1.8
meter ( 6 feet )
|
50
|
During
the use of an basket the lanyard shell be secured to?
|
|
51
|
Hydrostatic
and pneumatic strength pressure testing and leak testing shell
comply with GI |
GI
2.102
|
52
|
What
is the distance for crane boom, If overhead power lines up to
250,000 volts? |
6
meter ( 20 feet ).
|
53
|
What
is the distance of night time warning lights spaced , and above
|
Spacing
every 2 feet and 3 feet above the ground.
|
|
54
|
Give
five equipments which are required Inspection Sticker?
|
Crane,
Man lift, Boom truck, Spider Basket and Man Basket.
|
|
55
|
When
required ear plug / muff?
|
90
dBA & above.
|
|
56
|
How
much First Aid trained required in one remote site?
|
One
|
|
57
|
The
CSMH
|
( C
) Is intended for use at the job site
by company
|
|
a.
|
Is
condensed version of the full size CSM.
|
||
b.
|
Lists common safety rules for
Construction.
|
||
c.
|
Is intended
for use at the job site by company representative and
|
||
d.
|
All
of above.
|
||
58
|
When
an accident happens you shall :-
|
( C )
Report immediately to company proponent.
|
|
a.
|
Call
the police.
|
||
b.
|
Clean
up the accident scene.
|
||
c.
|
Report
immediately to company proponent.
|
||
d.
|
All
of the above.
|
||
59
|
With
in____________of being aware of an incident, the company
|
( B
) 1 day ( 24 hours )
|
|
representative
shall notify the area loss Prevention Officer
|
|||
a.
|
1
hour
|
||
b.
|
1 day
( 24 hours )
|
||
c.
|
6
hours
|
||
d.
|
12
hours
|
||
60
|
Contractor
Safety Officer or site Safety Supervisor shall :-
|
( D
) All of the above.
|
|
a.
|
Interact
with the company representative on health & safety issues.
|
||
b.
|
Inspect
work site daily.
|
||
c.
|
Keep
record of all safety meetings.
|
||
d.
|
All
of the above.
|
||
61
|
The
contractor must provide one toilet for every :-
|
( B )
15 workers.
|
|
a.
|
50
workers.
|
||
b.
|
15
workers.
|
||
c.
|
25
workers.
|
||
d.
|
10
workers.
|
||
62
|
Safety
belts (Waist Belt ) shall be used for fall arrest if it is rated at 2450
|
( B
) False
|
|
kg.
|
|||
a.
|
True b. False
|
63
|
The sanitary code states
that :-
|
( D
) None of above.
|
|
a.
|
Eating
is allowed on the worksite.
|
||
b.
|
You
shall provide one toilet for every 50 persons.
|
||
c.
|
You
shall provide drinking water and a dipper.
|
||
d.
|
None
of above.
|
||
64
|
Housekeeping
required are :-
|
( C )
Bend-down or remove nails in board.
|
|
a.
|
Collect
trash, debris and refuse monthly.
|
||
b.
|
Use
opened topped containers for trash.
|
||
c.
|
Bend-down
or remove nails in board.
|
||
d.
|
All
of the above.
|
||
65
|
Site
planning for the lay down yards include :-
|
( B
) A study and grounded perimeter fence
with
|
|
a.
|
Proponent
approved lay down yards shall be at least 30 meters
|
||
(100 Feet ) away from building.
|
|||
b.
|
A
study and grounded perimeter fence with fire-engine access gate
|
||
shall enclose the area.
|
|||
c.
|
Fire
protection is not required as per CSM appendix C.
|
||
d.
|
All
of the above.
|
||
66
|
The
contractor shall provide First Aid facilities for his employees which
|
( D
) All of the above.
|
|
include:-
|
|||
a.
|
A
First Aid cabinet on each job site.
|
||
b.
|
At
least on man at every remote site shall be trained in first aid.
|
||
c.
|
A
dedicated emergency vehicle ( ambulance ) must be provided to
|
||
transport injured persons.
|
|||
d.
|
All
of the above.
|
||
67
|
When
more than 50 employees work inside a 15 Kilometers radius, there
|
( A
) A nurse or first aid facility.
|
|
shall
be:-
|
|||
a.
|
A
nurse or first aid facility.
|
||
b.
|
A
toilet.
|
||
c.
|
A
fire extinguisher.
|
||
d.
|
Non
all of the above.
|
||
68
|
Full
body harness shall be prevent falls grater than :-
|
( C )
1.8 meter ( 6 feet ).
|
|
a.
|
1
meter ( 3.33 feet ).
|
||
b.
|
1.5
meter ( 5 feet ).
|
||
c.
|
1.8
meter ( 6 feet ).
d. None all of the above. |
69
|
Foreman
/ Supervisor shall :-
|
( C )
Conduct weekly safety meeting.
|
|
a.
|
Prepare
and submit an HIP for Loss Prevention review and
|
||
approval.
|
|||
b.
|
Investigate
accidents and reports finding.
|
||
c.
|
Conduct
weekly safety meeting.
|
||
d.
|
Assure
that work permit procedure is followed by all subordinates.
|
||
70
|
A
preliminary report is due within 24
hours complete with a copy to loss
|
( A
) True
|
|
prevention
.
|
|||
a.
|
True
|
||
b.
|
False.
|
||
71
|
Drivers
shall not allow passengers to ride in their vehicle unless they have
|
( A
) True
|
|
72
|
Heavy
equipment drivers shall :
|
( D
) Report any accident or damage
immediately.
|
|
a.
|
cover
the windows to protect there eyes from the sun.
|
||
b.
|
Allow
passengers to ride in their vehicles without wearing a seat
|
||
belt.
|
|||
c.
|
Drive
with speed if there is no vehicle in front of him.
|
||
d.
|
Report
any accident or damage immediately.
|
||
73
|
There are three kind of work permit in system.
|
( B
) False.
|
|
a.
|
True.
|
||
b.
|
False.
|
||
74
|
Countersignatures
shall be obtained by issues and receivers.
|
( B
) False.
|
|
a.
|
True.
|
||
b.
|
False.
|
||
75
|
Gas
testing for the work permit should be done by :-
|
(A ) A certified
gas tester
|
|
a.
|
A certified gas tester
|
||
b.
|
The
contractor.
|
||
c.
|
The inspector
|
||
d.
|
None
all of the above.
|
||
76
|
The
work permit should be revised if there is any change in the condition.
a. True. b. False |
( A
) True
|
77
|
Common
excavations risks include :
|
( D
) All of the above.
|
|
a.
|
Cave-in.
|
||
b.
|
Toxic
gasses.
|
||
c.
|
Striking
buried service lines.
|
||
d.
|
All
of the above.
|
||
78
|
Shoring
for excavations shall include :
|
( A
) Vertical excavations that are grater
than 2.4 meter
|
|
a.
|
Vertical
excavations that are grater than 2.4 meter ( 8 feet ) deep
|
||
shall be shored.
|
|||
b.
|
Shoring
boxes shall be kept occupied during movement and
|
||
installation.
|
|||
c.
|
Trench
shield walls must extend above the excavation walls.
|
||
d.
|
None
of the above.
|
||
79
|
Transportation
for the flammable liquids shall be in closed metal
|
( A
) True
|
|
containers.
|
|||
a.
|
True.
|
||
b.
|
False.
|
||
80
|
Ladders
at the excavation should be placed within shored area and tied off
|
( A
) True
|
|
to
prevent slipping :
|
|||
a.
|
True.
|
||
b.
|
False.
|
||
81
|
Slope
walls are not acceptable as a substitute for shoring.
|
( B
) False.
|
|
a.
|
True.
|
||
b.
|
False.
|
||
82
|
Type________________soil
is mix of sand, rock and clay must be slope
|
( B
) B,1 to 1 slope or 45º
|
|
at :
|
|||
a.
|
A,
¾ 1 slope or 53º
|
||
b.
|
B,1
to 1 slope or 45º
|
||
c.
|
C,
1.5 to1 slope or 34º
|
||
d.
|
Non
of the above.
|
||
83
|
Exit
ladder at confined space entry into a 1.2 meter ( 4 feet ) deep or
|
( D
) Only answer “ A & C “are
correct.
|
|
deeper
trench.
|
|||
a.
|
Must
be placed every 7.5 meter ( 25 feet )
set at 75º angle.
|
||
b.
|
Shall
not be extended above the ground level.
|
||
c.
|
Must
be secured.
d. Only answer “ A & C “are correct. |
84
|
For
demolition, the approved HIP should describe the following :-
|
( A
) Isolation of specific utility
service.
|
||
a.
|
Isolation
of specific utility service.
|
|||
b.
|
Debris
from demolition shall not be rendered because it might to
|
|||
used later.
|
||||
c.
|
Work
permit requirement.
|
|||
d.
|
All
of the above.
|
|||
85
|
When
working where asbestos and others are present :-
|
( B )
Showering and washing facilities shall be provided
|
||
a.
|
Paper
dust mask should be worn.
|
|||
b.
|
Showering
and washing facilities shall be provided for all asbestos
|
|||
workers at the all job site and used daily by
each man.
|
||||
c.
|
Beard
will allow a safe seal with respirators.
|
|||
d.
|
None
all of the above.
|
|||
86
|
When
you want to remove asbestos :-
|
( B )
Wet asbestos with water before remove the asbestos.
|
||
a.
|
Use
electrical tools to cut and remove asbestos.
|
|||
b.
|
Wet
asbestos with water before remove the asbestos.
|
|||
c.
|
Use
vacuum.
|
|||
d.
|
Non
of above all.
|
|||
87
|
Acetylene
becomes unstable at pressure ___________ 103 Kpa (15 psi )
|
( C )
To make it easy to be stored.
|
||
a.
|
Equal.
|
|||
b.
|
Below.
|
|||
c.
|
Above.
|
|||
d.
|
None
of the above.
|
|||
88
|
The
reason that acetylene cylinders be stored, handled and used in the
|
( A )
|
to
prevent the acetylene and liquid acetone from
|
|
vertical
position is :-
|
separating
|
|||
a.
|
to
prevent the acetylene and liquid acetone from separating
|
|||
b.
|
To
allow it mix with air.
|
|||
c.
|
To
make it easy to be stored.
|
|||
d.
|
None of the above.
|
|||
89
|
In
order to store cylinder safely :-
|
( D
) All of above.
|
||
a.
|
They
should be store in safe, dry well ventilated place.
|
|||
b.
|
Flammable
substance should not be stored in the same area.
|
|||
c.
|
They
should be not stored near a source of heat.
|
|||
d.
|
All
of above.
|
|||
90
|
Welding
and cutting torches shall be :-
a. Constructed of brass, bronze or stainless steel. b. Bear a UL or FM label. c. Have colored code hashes. d. All of above. |
( D
) All of the above.
|
91
|
Flash
back flame arrestors should be place on both the regulator and
|
( B
) False.
|
|
torch.
|
|||
a.
|
True.
|
||
b.
|
False.
|
||
92
|
Oil
grease may be used on oxygen cylinder fittings or system.
|
( B
) False.
|
|
a.
|
True.
|
||
b.
|
False.
|
||
93
|
Hand
held power tools that are plugged into a welding machine.
|
( A
) Shall have a GFCI.
|
|
a.
|
Shall
have a GFCI.
|
||
b.
|
Shall
be made from conductive materials.
|
||
c.
|
Are
not allowed.
|
||
d.
|
None
of the above.
|
||
94
|
Welding
hoods shall be worn by the welder and helper.
|
( A
) True
|
|
a.
|
True
|
||
b.
|
False
|
||
95
|
Compressed
gas cylinders requirements :-
|
( D
) All of the above.
|
|
a.
|
Don’t
use cylinders have dents, rust, gouges or burn marks.
|
||
b.
|
Make
empty cylinders as “ MT “ with chalk.
|
||
c.
|
Remove
from service any compressed gas cylinder in violation of
|
||
the regulation.
|
|||
d.
|
All
of the above.
|
||
96
|
Leak
check on cylinders may done by :-
|
( B
) Applying a soap water solution.
|
|
a.
|
Using
a lit match.
|
||
b.
|
Applying
a soap water solution.
|
||
c.
|
listening
for a hissing sound.
|
||
d.
|
None
of the above.
|
||
97
|
A
work permit is not required for blasting operation.
|
( B
) False.
|
|
a.
|
True.
|
||
b.
|
False.
|
||
98
|
The__________________
is responsible for all safety aspects
of the explosive operation.
|
( B
) Blaster - in- charge.
|
99
|
Crane
can be used to extract hammer driven piles.
|
( B
) False
|
|
a.
|
True.
|
||
b.
|
False.
|
||
100
|
Piles
driving equipments need to have a veiled inspection sticker.
|
( A
) True
|
|
a.
|
True.
|
||
b.
|
False.
|
||
101
|
Crane
shall not be used as pile drivers and shall not be used to drop any
|
( A
) True
|
|
load.
|
|||
a.
|
True.
|
||
b.
|
False.
|
||
102
|
_____________
can be used to extract hammer and driven piles.
|
( C
) Steam, air or electric extractor.
|
|
a.
|
Sound
lifting gear.
|
||
b.
|
Crane.
|
||
c.
|
Steam,
air or electric extractor.
|
||
d.
|
None
of the above.
|
||
103
|
Trenching
and road closer require:-
|
( D
) All of the above.
|
|
a.
|
Work
permit.
|
||
b.
|
Road
work and road closer plans submitted to loss prevention.
|
||
c.
|
Notices published in the
highlights and notice
|
||
before the road closed.
|
|||
d.
|
All
of the above.
|
||
104
|
To
reduce the traffic hazards :-
|
( D )
Only answer A & C are correct.
|
|
a.
|
Flagman
shall be positioned to warn approaching traffic of active
|
||
roadwork.
|
|||
b.
|
English
only signs must be posted.
|
||
c.
|
Arabic
& English sign board must be posted.
|
||
d.
|
Only
answer A & C are correct.
|
||
105
|
Ladder
shall be use on top of the scaffolding work platform.
|
( B
) False.
|
|
a.
|
True
|
||
b.
|
False.
|
||
106
|
In
order to use stepladder safely :-
a. Two men should be on ladder at the same time to balance the ladder. b. Never stand on the top step. c. Step ladder should be used to gain access to roof or other elevated surfaces. d. Lean it against wall for support. |
( B
) False.
|
107
|
Pressure
testing ( GI 2. 102) covers what type of tests.
|
( D
) All of the above.
|
|
a.
|
Hydrostatic.
|
||
b.
|
Leak
tests.
|
||
c.
|
Pneumatic
tests.
|
||
d.
|
All
of the above.
|
||
108
|
Damaged
ladder should be :-
|
( C
) Remove from the site.
|
|
a.
|
Painted.
|
||
b.
|
Remanufactured
|
||
c.
|
Remove
from the site.
|
||
d.
|
None
of the above.
|
||
109
|
Extension
ladders shall be extended 0.9 meter ( 3 Feet ) above the
|
( A
) True
|
|
landing.
|
|||
a.
|
True.
|
||
b.
|
False.
|
||
110
|
Erected
scaffold required that :-
|
( D
) All of the above.
|
|
a.
|
Erection
and assembly shall be done by trained and authorized
|
||
persons.
|
|||
b.
|
Inspection
shall be made every day.
|
||
c.
|
That erection
plan is submitted to Loss Prevention for all
|
||
scaffoldings above 38 meters ( 128 feet ).
|
|||
d.
|
All
of the above.
|
||
111
|
Scaffolding
planks :-
|
( B
) Shall not be cracked more than 12 “.
|
|
a.
|
Shall
be painted.
|
||
b.
|
Shall
not be cracked more than 12 “.
|
||
c.
|
Shall
not extend beyond the end frame.
|
||
d.
|
All
of the above.
|
||
112
|
Don’t
support scaffold on concrete blocks, barrels and scaffold planks.
|
( A
) True
|
|
a.
|
True.
|
||
b.
|
False.
|
113
|
All
electrical operated hand tools :-
|
( D
) Only A & B answer are correct.
|
|
a.
|
Shall
be plugged into GFCI.
|
||
b.
|
Shall
be bear a UL and FM label.
|
||
c.
|
Electrical
power can be used up to 220 volts AC.
|
||
d.
|
Only
A & B are correct.
|
||
114
|
All
sandblast components and work surfaces shall be electrically bonded
|
( A
) True
|
|
to
the compressor and the compressor grounded to a permanent ground to
|
|||
prevent
static electricity build-up.
|
|||
a.
|
True
|
||
b.
|
False.
|
||
115
|
In
tarring operation;-
|
( C )
Temperature of hot asphalt may exceed
232º C ( 450º F
|
|
a.
|
Tar
shall heat on roof top.
|
||
b.
|
Hot
asphalt shall be lifted in buckets.
|
||
c.
|
Temperature
of hot asphalt may exceed 232º C (
450º F ).
|
||
d.
|
None
of the above.
|
||
116
|
Load
charts and range damnations shall be displayed in every crane cab.
|
( A
) True
|
|
a.
|
True.
|
||
b.
|
False.
|
||
117
|
Crane
booms shall be kept_____________ from overhead power line up
|
( A
) 6 meter ( 20 feet ),7.5 meters (25
feet ).
|
|
to
250,000 volts and _________ above 250,000 volts.
|
|||
a.
|
6
meter ( 20 feet ),7.5 meters (25 feet ).
|
||
b.
|
9
meters ( 30 feet ), 10.5 meters (350 feet ).
|
||
c.
|
12 meters
(40 feet ), 13.5 meters (40 feet ).
|
||
d.
|
None
of the above.
|